<div itemscope="itemscope" itemtype="http://schema.org/Event"><meta itemprop="name" content="803-2 Reservoir Interior/Exterior Coatings and Upgrades Project (CIP 2565)"><meta itemprop="url" content="https://www.otaywater.gov/es/servicios-de-ingenieria/cip/803-2-reservoir-interior-exterior-coatings-and-upgrades-project-cip-2565/"><meta itemprop="startDate" content="1970-01-01T00:00:00"><meta itemprop="endDate" content="1970-01-01T00:00:00">{"id":17787,"date":"2019-01-03T14:56:07","date_gmt":"2019-01-03T22:56:07","guid":{"rendered":"http:\/\/dev1.otaywater.gov\/?page_id=17787"},"modified":"2021-03-08T15:47:06","modified_gmt":"2021-03-08T23:47:06","slug":"803-2-reservoir-interior-exterior-coatings-and-upgrades-project-cip-2565","status":"publish","type":"page","link":"https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/cip\/803-2-reservoir-interior-exterior-coatings-and-upgrades-project-cip-2565\/","title":{"rendered":"803-2 Reservoir Interior\/Exterior Coatings and Upgrades Project (CIP 2565)"},"content":{"rendered":"<meta itemprop=\"description\" content=\"WHAT: The project will provide interior and exterior recoating and upgrades to the welded steel 803-2 Reservoir. The official name of each reservoir relates to its location above sea level....\"><\/div><div id=\"attachment_17450\" style=\"width: 296px\" class=\"wp-caption alignright\"><a href=\"https:\/\/otaywater.gov\/wp-content\/uploads\/2018\/12\/Location-Map-803-2.jpg\"><img decoding=\"async\" aria-describedby=\"caption-attachment-17450\" class=\"wp-image-17450\" src=\"https:\/\/otaywater.gov\/wp-content\/uploads\/2018\/12\/Location-Map-803-2.jpg\" alt=\"map\" width=\"286\" height=\"369\" \/><\/a><p id=\"caption-attachment-17450\" class=\"wp-caption-text\"><strong>Click on the image above to enlarge.<\/strong><\/p><\/div>\n<h4><strong><span style=\"color: #006666;\">WHAT:<\/span><\/strong><\/h4>\n<p>The project will provide interior and exterior recoating and upgrades to the welded steel 803-2 Reservoir. The official name of each reservoir relates to its location above sea level. Service will not be interrupted during the recoating of the reservoir.<\/p>\n<p>803-2 Reservoir Capacity: 2.0 million gallons<\/p>\n<h4><strong><span style=\"color: #006666;\">WHERE:<\/span><\/strong><\/h4>\n<p>2600 Willow Glen Drive, El Cajon, CA 92019<\/p>\n<h4><strong><span style=\"color: #006666;\">WHEN:<\/span><\/strong><\/h4>\n<p>December 10, 2018 through May 30, 2019 (estimated)<\/p>\n<h4><span style=\"color: #006666;\"><strong>WHO:<\/strong><\/span><\/h4>\n<p>Otay Water District and Advanced Industrial Services, Inc.<\/p>\n<h4><strong><span style=\"color: #006666;\">WHY:<\/span><\/strong><\/h4>\n<p>Recoating reservoirs is standard maintenance that preserves the quality and safety of customers\u2019 water supply by maintaining the integrity of the storage structure. Customers save money over time when routine maintenance is performed on a regular basis.<\/p>\n<h4><strong><span style=\"color: #036b6b;\">PROJECT OVERVIEW:<\/span><\/strong><\/h4>\n<p><strong>Noise and traffic disruptions are not anticipated.<\/strong><\/p>\n<p>No water service disruptions are expected during the recoating and upgrade work since each zone has a redundant reservoir for the service area.<\/p>\n<h4><strong><span style=\"color: #006666;\">PROJECT COST:<\/span><\/strong><\/h4>\n<p>The District\u2019s budget for the 803-2 Reservoir Interior\/Exterior Coatings and Upgrades Project is approximately $1.2 million.<\/p>\n<p>For additional information about the project, please contact the Project Manager Kevin Cameron, PE, at (619) 670-2248 or via e-mail at\u00a0<a href=\"mailto:kcameron@otaywater.gov\">kcameron@otaywater.gov<\/a>.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>WHAT: The project will provide interior and exterior recoating and upgrades to the welded steel 803-2 Reservoir. The official name of each reservoir relates to its location above sea level&#8230;.<\/p>\n","protected":false},"author":43,"featured_media":0,"parent":17779,"menu_order":1,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"calendar":[],"class_list":["post-17787","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>803-2 Reservoir Interior\/Exterior Coatings and Upgrades Project (CIP 2565) - Otay Water District<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/cip\/803-2-reservoir-interior-exterior-coatings-and-upgrades-project-cip-2565\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"803-2 Reservoir Interior\/Exterior Coatings and Upgrades Project (CIP 2565) - Otay Water District\" \/>\n<meta property=\"og:description\" content=\"WHAT: The project will provide interior and exterior recoating and upgrades to the welded steel 803-2 Reservoir. The official name of each reservoir relates to its location above sea level....\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/cip\/803-2-reservoir-interior-exterior-coatings-and-upgrades-project-cip-2565\/\" \/>\n<meta property=\"og:site_name\" content=\"Otay Water District\" \/>\n<meta property=\"article:modified_time\" content=\"2021-03-08T23:47:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/otaywater.gov\/wp-content\/uploads\/2018\/12\/Location-Map-803-2.jpg\" \/>\n<meta name=\"twitter:label1\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minuto\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/cip\/803-2-reservoir-interior-exterior-coatings-and-upgrades-project-cip-2565\/\",\"url\":\"https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/cip\/803-2-reservoir-interior-exterior-coatings-and-upgrades-project-cip-2565\/\",\"name\":\"803-2 Reservoir Interior\/Exterior Coatings and Upgrades Project (CIP 2565) - Otay Water District\",\"isPartOf\":{\"@id\":\"http:\/\/www.otaywater.gov\/es\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/cip\/803-2-reservoir-interior-exterior-coatings-and-upgrades-project-cip-2565\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/cip\/803-2-reservoir-interior-exterior-coatings-and-upgrades-project-cip-2565\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/otaywater.gov\/wp-content\/uploads\/2018\/12\/Location-Map-803-2.jpg\",\"datePublished\":\"2019-01-03T22:56:07+00:00\",\"dateModified\":\"2021-03-08T23:47:06+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/cip\/803-2-reservoir-interior-exterior-coatings-and-upgrades-project-cip-2565\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/cip\/803-2-reservoir-interior-exterior-coatings-and-upgrades-project-cip-2565\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/cip\/803-2-reservoir-interior-exterior-coatings-and-upgrades-project-cip-2565\/#primaryimage\",\"url\":\"https:\/\/otaywater.gov\/wp-content\/uploads\/2018\/12\/Location-Map-803-2.jpg\",\"contentUrl\":\"https:\/\/otaywater.gov\/wp-content\/uploads\/2018\/12\/Location-Map-803-2.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/cip\/803-2-reservoir-interior-exterior-coatings-and-upgrades-project-cip-2565\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.otaywater.gov\/es\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Servicios de ingenier\u00eda\",\"item\":\"https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Programa de mejora de capital\",\"item\":\"https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/cip\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"803-2 Reservoir Interior\/Exterior Coatings and Upgrades Project (CIP 2565)\"}]},{\"@type\":\"WebSite\",\"@id\":\"http:\/\/www.otaywater.gov\/es\/#website\",\"url\":\"http:\/\/www.otaywater.gov\/es\/\",\"name\":\"Otay Water District\",\"description\":\"Dedicated to Community Service\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"http:\/\/www.otaywater.gov\/es\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"803-2 Reservoir Interior\/Exterior Coatings and Upgrades Project (CIP 2565) - Otay Water District","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/cip\/803-2-reservoir-interior-exterior-coatings-and-upgrades-project-cip-2565\/","og_locale":"es_ES","og_type":"article","og_title":"803-2 Reservoir Interior\/Exterior Coatings and Upgrades Project (CIP 2565) - Otay Water District","og_description":"WHAT: The project will provide interior and exterior recoating and upgrades to the welded steel 803-2 Reservoir. The official name of each reservoir relates to its location above sea level....","og_url":"https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/cip\/803-2-reservoir-interior-exterior-coatings-and-upgrades-project-cip-2565\/","og_site_name":"Otay Water District","article_modified_time":"2021-03-08T23:47:06+00:00","og_image":[{"url":"https:\/\/otaywater.gov\/wp-content\/uploads\/2018\/12\/Location-Map-803-2.jpg","type":"","width":"","height":""}],"twitter_misc":{"Tiempo de lectura":"1 minuto"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/cip\/803-2-reservoir-interior-exterior-coatings-and-upgrades-project-cip-2565\/","url":"https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/cip\/803-2-reservoir-interior-exterior-coatings-and-upgrades-project-cip-2565\/","name":"803-2 Reservoir Interior\/Exterior Coatings and Upgrades Project (CIP 2565) - Otay Water District","isPartOf":{"@id":"http:\/\/www.otaywater.gov\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/cip\/803-2-reservoir-interior-exterior-coatings-and-upgrades-project-cip-2565\/#primaryimage"},"image":{"@id":"https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/cip\/803-2-reservoir-interior-exterior-coatings-and-upgrades-project-cip-2565\/#primaryimage"},"thumbnailUrl":"https:\/\/otaywater.gov\/wp-content\/uploads\/2018\/12\/Location-Map-803-2.jpg","datePublished":"2019-01-03T22:56:07+00:00","dateModified":"2021-03-08T23:47:06+00:00","breadcrumb":{"@id":"https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/cip\/803-2-reservoir-interior-exterior-coatings-and-upgrades-project-cip-2565\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/cip\/803-2-reservoir-interior-exterior-coatings-and-upgrades-project-cip-2565\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/cip\/803-2-reservoir-interior-exterior-coatings-and-upgrades-project-cip-2565\/#primaryimage","url":"https:\/\/otaywater.gov\/wp-content\/uploads\/2018\/12\/Location-Map-803-2.jpg","contentUrl":"https:\/\/otaywater.gov\/wp-content\/uploads\/2018\/12\/Location-Map-803-2.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/cip\/803-2-reservoir-interior-exterior-coatings-and-upgrades-project-cip-2565\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.otaywater.gov\/es\/"},{"@type":"ListItem","position":2,"name":"Servicios de ingenier\u00eda","item":"https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/"},{"@type":"ListItem","position":3,"name":"Programa de mejora de capital","item":"https:\/\/www.otaywater.gov\/es\/servicios-de-ingenieria\/cip\/"},{"@type":"ListItem","position":4,"name":"803-2 Reservoir Interior\/Exterior Coatings and Upgrades Project (CIP 2565)"}]},{"@type":"WebSite","@id":"http:\/\/www.otaywater.gov\/es\/#website","url":"http:\/\/www.otaywater.gov\/es\/","name":"Otay Water District","description":"Dedicated to Community Service","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"http:\/\/www.otaywater.gov\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"}]}},"_links":{"self":[{"href":"https:\/\/www.otaywater.gov\/es\/wp-json\/wp\/v2\/pages\/17787","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.otaywater.gov\/es\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.otaywater.gov\/es\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.otaywater.gov\/es\/wp-json\/wp\/v2\/users\/43"}],"replies":[{"embeddable":true,"href":"https:\/\/www.otaywater.gov\/es\/wp-json\/wp\/v2\/comments?post=17787"}],"version-history":[{"count":2,"href":"https:\/\/www.otaywater.gov\/es\/wp-json\/wp\/v2\/pages\/17787\/revisions"}],"predecessor-version":[{"id":24685,"href":"https:\/\/www.otaywater.gov\/es\/wp-json\/wp\/v2\/pages\/17787\/revisions\/24685"}],"up":[{"embeddable":true,"href":"https:\/\/www.otaywater.gov\/es\/wp-json\/wp\/v2\/pages\/17779"}],"wp:attachment":[{"href":"https:\/\/www.otaywater.gov\/es\/wp-json\/wp\/v2\/media?parent=17787"}],"wp:term":[{"taxonomy":"calendar","embeddable":true,"href":"https:\/\/www.otaywater.gov\/es\/wp-json\/wp\/v2\/calendar?post=17787"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}